风洞测控系统技术改造

Technology Alteration for Measure and Control System in the Wind Tunnel
  • 摘要
  • | |
  • 访问统计
  • |
  • 参考文献 [4]
  • |
  • 相似文献 [20]
  • |
  • 引证文献
  • | |
  • 文章评论
    摘要:

    针对某风洞测控系统存在的不足,对其进行了相应的技术改造。重点介绍测控系统技术改造的技术指标、 实施方案、设备调试情况以及技改后的应用情况。试验结果表明:该设计方案合理,技改后的测控系统性能稳定、 可靠,能达到预期效果,具有一定的应用价值。

    Abstract:

    In order to solve the flaw of measure and control system in the wind Tunnel, technology alteration has been made. This paper introduces the main technical indexes, general design scheme, equipment debugging and application after the technology alteration. After some wind tunnel tests are finished, it has been proved that the design scheme of the new system is reasonable, its performance is stable, reliable, the expected effect has been satisfied, and the technology alteration has some application value.

    参考文献
    [1] 金以慧, 等. 过程控制[M]. 北京: 清华大学出版, 1993: 10-22.
    [2] 廖常初. S7-300/400 PLC 应用技术[M]. 北京: 机械工业 出版社, 2006: 50-100.
    [3] 刘海涛. Borland C++ Builder[M]. 北京: 清华大学出版 社, 2000: 20-50.
    [4] 崔坚. 西门子S7 可编程序控制器-STEP 7 编程指南[M]. 北京: 机械工业出版社, 2007: 23-45.
    引证文献
    网友评论
    网友评论
    分享到微博
    发 布
引用本文

周晓刚,杨海滨,黄昊宇,张伟,刘刚,邹涵.风洞测控系统技术改造[J].,2012,31(01):65-67.

复制
分享
文章指标
  • 点击次数:505
  • 下载次数: 529
  • HTML阅读次数: 0
  • 引用次数: 0
历史
  • 收稿日期:2013-02-23
文章二维码