装备开发过程中任务与费用资源优化分配研究
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Research on Optimal Allocation of Tasks and Costs Resource in Process of Equipment Development
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对基于集成产品研发团队(integrated product team,IPT)群的并行开发管理模式分析其在开发过程中怎样兼顾任务与费用。在对装备系统开发过程中,制定关联任务分解原则,建立任务分解模型,并将任务与费用资源在不同IPT间进行优化分配。研究结果表明,该研究可提高装备系统开发的效费比和管理水平。

    Abstract:

    Aiming at the concurrent development management mode based on integrated product team (IPT) group, this paper analyzes how to balance the task and cost in the development process. In the process of equipment system development, the principle of associated task decomposition is formulated, the task decomposition model is established, and the task and cost resources are optimally allocated among different IPTs. The results show that the study can improve the cost-effectiveness ratio and management level of equipment system development.

    参考文献
    相似文献
    引证文献
引用本文

王江为.装备开发过程中任务与费用资源优化分配研究[J].,2023,42(09).

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2023-05-19
  • 最后修改日期:2023-06-18
  • 录用日期:
  • 在线发布日期: 2023-09-27
  • 出版日期: